WEEK 8 - Steel's up
The lift is back in action and the steel beams have been successfully installed. Having been given a coat of red oxide paint, the structure now looks like that famous Victorian engineering masterpiece, the Forth Rail Bridge!
During the day, the floor insulation layer in the utility has been fitted and a truck-load of timber, for the first floor frame, has been delivered.