LGF floor concrete complete
That's it! Floor concrete is all in place and the "chippies" are poised to move in on Monday to start the timber work. And with the new drain pipes cut open within the concrete manholes, we can keep a close eye - literally - on the stuff flowing through the pipes. Not that this is likely to become a new pastime, however, it will enable us to verify there are no blockages and that the drains are actually sloping the right way, into the main sewer. So far, everything is looking OK.